Establishing Credibility through Relevant
and Properly Cited References.
EPCI BGP MODIFICATION FOR GAS PLANT.
S.SEGAT PRODUCTION FACILITY DEV.MODIF.
JASA ANGKUTAN MATTERIAL TANAH URUG 50.000 m3.
JASA ANGKUTAN MATTERIAL TANAH URUG 73.000 m3.
NEW PIPE LINE RAPP 10 Inch SECTION SGP TO KP20.
JASA ANGKUTAN MATERIAL TANAH URUG 177.000 M3.
REFURBISHMENT BARE VESSEL FOR SLUG CATCHER & INSTRUMENT AUR RECEIVER.
FUTURE TIE IN NEW PIPE LINE SGP1 SHUTDOWN.
MODIFICATION LINE PIPING DISCHARGE GAS COMPRESSOR.
JASA ANGKUTAN MATERIAL TANAH URUG 95.000 m3.
JASA ANGKUTAN MATERIAL TANAH URUG 29.000 m3.
JASA ANGKUTAN MATERIAL TANAH URUG 84.300 m3.
JASA TRANSPORTASI DAN PENGOLAHAN LIMBAH (NON-HIS).
REFURBISHMENT WORK OF PWT (MECH & PIPING).
REPAIR AND INSTALLATION DIESEL FUEL TANK.
EPCI BGP MODIFICATION FOR GAS PLANT.
S.SEGAT PRODUCTION FACILITY DEV.MODIF.
JASA ANGKUTAN MATTERIAL TANAH URUG 73.000 m3.
JASA ANGKUTAN MATTERIAL TANAH URUG 50.000 m3.
NEW PIPE LINE RAPP 10 Inch SECTION SGP TO KP20.
REFURBISHMENT BARE VESSEL FOR SLUG CATCHER & INSTRUMENT AUR RECEIVER.
JASA ANGKUTAN MATERIAL TANAH URUG 177.000 M3.
FUTURE TIE IN NEW PIPE LINE SGP1 SHUTDOWN.
MODIFICATION LINE PIPING DISCHARGE GAS COMPRESSOR.
JASA ANGKUTAN MATERIAL TANAH URUG 95.000 m3.
JASA ANGKUTAN MATERIAL TANAH URUG 29.000 m3.
JASA ANGKUTAN MATERIAL TANAH URUG 84.300 m3.
JASA TRANSPORTASI DAN PENGOLAHAN LIMBAH (NON-HIS).
REFURBISHMENT WORK OF PWT (MECH & PIPING).
REPAIR AND INSTALLATION DIESEL FUEL TANK.
Delivering exceptional construction services beyond your expectations. Trust us to bring your vision to reality, with precision and expertise.